BHEL HARIDWAR SUMMER TRAINING REPORT PDF

Bhel haridwar bhopal summer training report [pdf format] bhel haridwar bhopal summer. It gives me a great pleasure to have an opportunity to acknowledge and to express gratitude to those who were associated with me during my training at BHEL. Floppy Emulator Usb Driver. I am very grateful to Mr.

Author:Nikogore Domuro
Country:Romania
Language:English (Spanish)
Genre:Software
Published (Last):1 August 2006
Pages:458
PDF File Size:1.87 Mb
ePub File Size:7.70 Mb
ISBN:412-6-50801-605-7
Downloads:78102
Price:Free* [*Free Regsitration Required]
Uploader:Samur



Seamless Steel Tubes xi. This collaboration still continues. In this process the pre- insulated copper conductor is cut into number of required length. Shells to be lined with tin based babbitt metal. It progressed rapidly and three more factories went into production in If you wish to simmer it, please recommend it to your friends in any social system. Thermal Power Station Plant. Industrial valves and Fabrication. Forming The straight bar stack is formed as per overhang profile as per designthe overhang portion is consolidated after forming.

The system is designed to maintain a constant rate cooing water flow through the stator winding at a nominal inlet with temperature of 40 degree centigrade. Insulation is removed from both ends of the conductor cut. L Haridwar plant, Uttarakhand. With good design and great care this problem can be solved. Then bar is taken out and pressed in closed box fixture and then baked at given temperature for given duration. The number of layers or thickness of insulation depends on the machine voltage.

Bhel Haridwar- Training report — MW bar CIM block 4 EEE The high mechanical stress resulting from the centrifugal force and short circuit, torque called for a high specified mechanical and magnetic properties as well as homogenous forging. All Ahridwar machines rated for more than 5 MVA or with armature core longer the machine is to be provided with at least 6 resistance thermometers of their couples which shall built inside the stator suitably distributed among the circumference at the likely hottest point.

The conductors are made of hard drawn silver bearing copper. Hydro set MW 3. For handling and transporting components overhead crane and electric driven transfer trolleys are used. Also this method has an inherent of eliminating the deformation of copper due to varying temperature. The bearings are provided with suitable temperature element due to monitor bearing metal reprot in operation.

To make this website work, we log user data and share it with processors. I would like to extend sincere thanks to Mr. All conductors have identical copper and cooling section. Stampings are held in a position by 20 core bars having dovetail section. The temperature control need not required.

Remember me on this computer. In the yearit was ranked ninth most innovative company in the world by US business magazine Forbes. To ensure that core losses are within limits and there are no hot spots present in the core. It supports the laminated core and winding the stator comprises an inner frame and outer frame.

This repogt is for high voltage test on stator winding of turbo generator. Related Articles.

ASSEMBLY AUTOMATION AND PRODUCT DESIGN BY BOOTHROYD PDF

BHEL HARIDWAR SUMMER TRAINING REPORT PDF

Tech 3rd year in mechanical engg. The nut at the harivwar of the bolt provides a stop for the bolt in the tripped position and for tripping speed adjustment. I am a 4th year student from mechanical branch. P steam turbinebut smaller than L.

SOCIAL MINDSCAPES AN INVITATION TO COGNITIVE SOCIOLOGY PDF

BHEL HARIDWAR SUMMER TRAINING REPORT BLOCK 4 PDF

Rajat satyanarayan Saxena Branch Unspecified. The velocity of the steam resulting from this haridear is absorbed in two or more rows of moving blades. Sushant Metkar Branch Unspecified. Please tell me the process for it and how to contact the employees of that particular region. Education and Career Forum. HEEP plant is divided into haridwae blocks.

Related Articles